
Labor, claims, downtime, and steel — the budget case in one place, with calculators that run on your numbers.
For the project or plant manager building a budget case. Every argument below is a design fact or a verified number with its source named. Where a figure depends on your plant — wages, roe curve, season length — the calculators below run on your numbers, not ours.
On the industry setup, workers pick guts out of the system and the crew runs at full strength all season. On a roe/gut separation line, the crew scales with the roe percentage. What that is worth depends on your roe curve and loaded wage — bring both to the quote.
One operator covers up to 10 to 12 rackers within line of sight. Calculator 1 runs the comparison against hand-offloading with your crew numbers.
Upper limbs took 43% of Alaska onshore seafood comp claims (NIOSH analysis of Alaska claims, 2014–2015). A lost-time hand, finger, or wrist claim averages $28,326; fracture/crush $69,576; amputation $149,543 (National Safety Council Injury Facts, NCCI data, 2022–2023 and 2023–2024). No promise is made that a machine prevents a claim — the equipment is designed so hands stay off racks and backs stay out of racking.
Bolt-on wear points swap with hand tools without shutting the line down, and a starter maintenance package puts spares on your shelf before the season. What an hour of line-down time costs is your plant’s number — multiply it by the stops you already take.
Metal used efficiently — night and day against typical fabrication. Less steel per line is a line item your estimator can check against any competing bid, pound for pound.
At Vojta’s operation, the right carts increased freezing capacity by 8% — same freezers, same floor, 8% more fish frozen. It is the cheapest capacity there is — no building to build for it. The Freezer Carts & Racks page has the carts.
Three scenario calculators. They run only on the numbers you type in, plus cited defaults where a default is needed. Every default is labeled with its source and can be changed. Nothing here promises a payback. It is arithmetic for your budget case.
The standard example: one operator running the dumpers instead of a crew of 8 hand-offloading carts. Put your own crew in.
A worker stationed at a 90° transition hand-moving fish — because the system doesn’t use gravity — has a seasonal price. This is it.
That cost repeats every season the transition stays unfixed. A gravity-fed transition is fixed once — see the Transitions page.
Racking by hand bends backs all season, and plants lose good workers to it. This totals claim cost plus replacement and training cost. The claim-cost default is the National Safety Council’s average for ALL lost-time claims ($50,076, 2023–2024, NCCI data). It is a general figure, used because no back-only Alaska figure is published. Change it if your insurer gives you a better one.
Set against it: racking at working height on the Elevators page — the elevator does the positioning, nobody bends, nobody reaches overhead.
Sources for cited defaults and figures: Syron et al., American Journal of Industrial Medicine (2019), NIOSH analysis of Alaska workers’ compensation claims, 2014–2015 · National Safety Council, Injury Facts, workers’ compensation costs (NCCI data), 2022–2023 and 2023–2024 · AKOSH Program Directive 24-03 (2024).
Putting a line together, or fixing one that fights you?
Request a Quote