Elevator row going together in the shop, crew on the frames.Elevators running in production — racks cycle at working height.The row at night — frames lined up down the bay.Hoists mounted on the frames — the drives that lift the carts.Elevator row with the conveyor line it feeds — one system.The finished row, installed and loaded with racks.Walkthrough of the elevator row.
The fish tank
Welding up the tank’s sloped-floor frame, in the plant.Frame welding along the tank side.Interior floor sheets going in, panel by panel.Under the frame — the structure that carries the tank.The finished tank — twin hopper bottoms on legs.
Waterfall glazers
Glazer box on sawhorses in the shop.A pair of glazer boxes, ready to go out.Chute unit, helmet for scale.Glazers installed over the line, from the walkway.Installed chute, from underneath.
Freezer racks & carts
Washdown — frost-covered freezer racks getting hosed down in a working plant.Rack stacks in the plant yard.
Dewatering boxes
The box, side view, in the yard.The box at work, from above — fish up the incline, water off.Moving a box by forklift.Inside the box — sloped channels, crew on it for scale.Fish coming up out of the ice water on the cleated incline.
Rack dumpers
Hydraulic cylinder and bolted wear plate, close up.The front-loading rack dumper, installed.The production floor from above, dumper in the foreground.
Conveyors & lines
Long conveyor frame line in the shop.The same run, from the other end.Headed fish running down a working line.High-volume butcher line, stations working.Crew racking fish beside the elevator row.
In the plants
Stainless hopper and grinder line, installed and running.Racking line crew at work, totes on the belt.Custom vessel, in the plant.Inside the vessel during the build.
Shop fabrication
Frame build on the bench, from above.Cutting diamond plate for an elevator platform.The bead, up close.Diamond-plate work platform.Small hopper, finished.A row of electric chain hoists, ready to wire — elevator drives.Cantilevered step unit.
Custom boats
Hull bottom panels laid out flat in the shop — the start of the build.Hull section hanging from the telehandler.On the trailer at the harbor, ready to launch.Running, two aboard.